New hydraulic jacking level bridge technique is used in construction of cooling tower wall to reduce construction period and equipment investment. This technique combines with electromechanical integration technique to realize high applicability. The technique is used in No.5 cooling tower project of Hebi Power Plant of He'nan, successfully satisfying the requirements of construction schedule, quality and safety and realizing favorable economic and social benefits.
PENG Xiao-yue,AO Xu-qiu,XIAO Li-peng et al. APPLICATION OF HYDRAULIC-JACKING LEVEL BRIDGE IN CONSTRUCTION OF LARGE COOLING TOWER[J]. Architecture Technology, 2013, 44(3): 277-279.