Abstract:
In high-rise building construction process of concrete, the template and the supporting frame is disconnected in the post pouring strip,effectively cut the vibration of the template and frame,when concrete pump generate pulse vibration,and reducing damage to the structure of early concrete cement. Adopts the" multiple template early-dismantling template support girder head " in the late poured band, reduce the stripping of two top teams. Not laying bottom template on the after-pouring,chiseling and cleaning is convenient. During the installation templates of after-pouring, the invention has simple operation, strong applicability, easy extension characteristics.
CUI Rong-qiang,HE Ji-jie,ZHAO Fang-fang et al. EARLY DISMANTLING CONSTRUCTION TECHNOLOGY OF TEMPLATE
DISCONNECT OF AFTER- POURING BEAM[J]. Architecture Technology, 2013, 44(8): 695-698.