Abstract:
During routine construction, the height of steel tubular scaffold increases when building height increases and the distance from the internal tube to the building and safety height are determined in advance according to the building profile and construction requirements. During local rebuilding of finished project, the scaffold shall be erected according to the profile of rebuilt building, and attaching wall must be constructed on the original building structure. When building profile changes or when the structure on which the scaffold is attached to, the distance of longitudinal and transverse attaching walls or attaching wall tube may be doubled. Therefore, the setting method of scaffold erection and attaching wall are discussed in local structural rebuilding, so as to guarantee the safe application of scaffold.
WANG Jian-lin,LI Sheng-yong,YANG Jun et al. WALL ATTACHMENT AND PROTECTION OF STEEL TUBULAR SCAFFOLD IN LOCAL
STRUCTURE REBUILDING ENGINEERING[J]. Architecture Technology, 2013, 44(8): 720-722.