Abstract:
Two-phase construction organization method of architectural decoration engineering divides the whole decoration construction into substrate treatment and surface decoration. This two-phase method is used in the Sanya Station of Hainan Eastern Ring Railway, and all decoration work is completed only within 6 months. Favorable engineering quality and management efficiency are realized.