[an error occurred while processing this directive]
建筑技术
 
 
建筑技术  2003, Vol. 34 Issue (3): 187-189    DOI:
试验研究 最新目录 | 下期目录 | 过刊浏览 | 高级检索
预应力管桩应用中的若干问题
SEVERAL PROBLEMS IN THE APPLICATION OF PRE-STRESSED CONCRETE TUBULAR PILE
 全文: PDF (0 KB)   HTML (1 KB)  输出: BibTeX | EndNote (RIS)      背景资料
摘要 预应力管桩具有单桩承载力高、适用范围广、施工速度快等优势,预应力管桩承载力会随时间的增长而提高。桩锤的选择要综合考虑各方面因素,桩身垂直度偏差应不超过1%。每根桩宜连续施打到底,并采取措施减少挤土现象,以保证桩的承载力和防止产生过大的桩身位移。
服务
把本文推荐给朋友
加入我的书架
加入引用管理器
E-mail Alert
RSS
作者相关文章
徐新跃
关键词预应力管桩   单桩承载力   试桩     
Abstract: There are a lot of advantages in pre-stressed concrete tubular pile such as higher bearing capacity,better adaptability and speedy construction progress.The longer the pile is being at work, the higher bearing capacity it will have.When selecting pile driver various factors should be considered.The verticality deviation should not exceed 1%.Individual pile should be kept driving continuously while earth squeezing should be avoided to ensure bearing capacity and minimized lateral displacement.
Key wordspre-stressed concrete tubular pile   single pile bearing capacity   test pile   
引用本文:   
徐新跃. 预应力管桩应用中的若干问题[J]. 建筑技术, 2003, 34(3): 187-189.
XU Xinyue. SEVERAL PROBLEMS IN THE APPLICATION OF PRE-STRESSED CONCRETE TUBULAR PILE[J]. Architecture Technology, 2003, 34(3): 187-189.
链接本文:  
http://www.jzjs.com/CN/     或     http://www.jzjs.com/CN/Y2003/V34/I3/187
 
没有找到本文相关图表信息
没有本文参考文献
[1] 张鹤年, 季 鹏, 刘英克. 高速公路桥梁工程中PHC管桩单桩承载力确定方法[J]. 建筑技术, 2012, 43(10): 913-916.
[2] 徐至钧, 李智宇, 戴远东. 预应力静压管桩试验与应用要点[J]. 建筑工人, 2011, 42(12): 1103-1109.
[3] 朱卫新,章雪峰,应义淼. 复杂桩端持力层条件下钻孔桩施工质量控制要点[J]. 建筑工人, 2011, 42(03): 275-277.
[4] 刘峻青 许永辉. 珠江三角洲地区桩基选型技巧浅析[J]. 建筑技术, 2005, 36(3): 177-178.
[5] 葛忻声 龚晓南. 灌注桩的竖向静载荷试验及其受力性状分析[J]. 建筑技术, 2003, 34(3): 183-184.
[6] 徐至钧 张晓玲. 挤扩支盘桩的施工与应用[J]. 建筑技术, 2003, 34(2): 106-107.
?
版权所有 © 2011 建筑技术杂志社
地址:北京市广莲路1号建工大厦A座9层,邮编100055 电话:(010)68512449 (010)63928687,63928688 e-mail:jzjs@sina.com
本系统由北京玛格泰克科技发展有限公司设计开发 技术支持:support@magtech.com.cn