Abstract:
Some parts of a refinery project are located on costal backfilled sand foundation, where the surface and upper part have poor stability and the lower part has relatively good stability, so precast square pile is adopted. Introduction is made on pile sinking, pile splicing and pile follower processes, as well as treatment methods for pile head breakage, neighbor pile damage caused by squeezing effect, etc.