Abstract:
Xiaoshan International Airport Terminal Building project has large building volume, large area and diversified storey heights. GPS and total station are used for measurement, to promote overall digital measurement and control technique. Meanwhile, triangle closing error and root mean square error are introduced to guarantee the measurement accuracy. After practical application, this method could shorten construction period and reduce construction cost.
ZHAO Zhuo-hui,WANG Hai-tao,YANG Yao et al. APPLICATION OF GPS POSITIONING MEASUREMENT TECHNIQUE
IN BUILDING CONSTRUCTION PROJECT[J]. Architecture Technology, 2014, 45(5): 396-399.