Abstract:
The terminal building project in Xiaoshan International Airport Phase II adopts Aluminum-Manganese-Magnesium metal roof system. The roof has diversified shapes and long and narrow roof boarding, which requires complex installation process. Construction quality and appearance effect are successfully guaranteed through effective control of measurement and setting out, in-situ processing of roof boarding, base fixing and roof boarding installation, etc., providing references for similar projects.