Abstract:
Cable-suspended dome is composed of upper latticed shell and lower tensioned cable, having complex prestressed cable arrangement and prestressing distribution. A gymnasium in Shangdong Province is taken as an example to analyze the whole construction process and research internal force and deformation of the structure during hoop-cable tensioning in batches. Reasonable tensioning scheme and relevant construction parameters are successfully determined.