Abstract:
Waterfront area suffers from high underground water level and head pressure. The upper end of anti-floating anchor rod shall pass through the underground coiled waterproof layer and be anchored into the foundation soleplate, so it becomes a weak point of waterproofing. An office building project in Laoshan District of Qingdao City adopts systematic waterproof treatment technique at anti-floating anchor rod root. This technique has simple and successive operation, which could bring down the leakage risk of underground structure, improve waterproof quality and reduce potential safety hazard in service.
JIN Yan-jun,CHEN Yong-jun. WATERPROOF TREATMENT TECHNIQUE OF ANTI-FLOATING ANCHOR ROD ROOT IN WATERFRONT PROJECT[J]. Architecture Technology, 2014, 45(7): 615-616.