建筑技术
 
 
建筑技术
施工技术 最新目录 | 下期目录 | 过刊浏览 | 高级检索
部分粘结预应力抗浮桩应用及渗水处理
APPLICATION OF PARTIAL BONDING PRESTRESSED ANTI-FLOATING PILE AND LEAKAGE TREATMENT
 全文: PDF (0 KB)   HTML (1 KB)  输出: BibTeX | EndNote (RIS)      背景资料
摘要 北京市朝阳区某酒店公寓场地地下水位较高,其裙房高3~5层,采用部分粘结预应力抗浮桩抵抗地下水的浮力。施工中针对地下3层底板9根钢绞线处的渗水情况,采用水泥基渗透结晶型防水涂料结合注浆止水的方案进行处理,效果良好。
服务
把本文推荐给朋友
加入我的书架
加入引用管理器
E-mail Alert
RSS
作者相关文章
王建明
何世鸣
关键词部分粘结预应力抗浮桩   抗浮桩   渗水处理     
Abstract:  A hotel apartment in Chaoyang district of Beijing is located in an area where the underground water level is high and it has 3- to 5-storey podium building, so partial bonding prestressed anti-floating pile is used to resist the buoyancy of underground water. Considering leakage at 9 pieces of steel strands of bottom plate on B3 floor, cementitious capillary crystalline waterproofing coating is used and grouting water-stop scheme is adopted to realize favorable construction effect.
Key wordspartial bonding prestressed anti-floating pile   anti-floating pile   leakage treatment   
引用本文:   
王建明,何世鸣. 部分粘结预应力抗浮桩应用及渗水处理[J]. 建筑技术, 2014, 45(7): 623-625.
WANG Jian-ming,HE Shi-ming. APPLICATION OF PARTIAL BONDING PRESTRESSED ANTI-FLOATING PILE AND LEAKAGE TREATMENT[J]. Architecture Technology, 2014, 45(7): 623-625.
链接本文:  
http://www.jzjs.com/CN/     或     http://www.jzjs.com/CN/Y2014/V45/I7/623
 
没有找到本文相关图表信息
没有本文参考文献
没有找到本文相关文献
?
版权所有 © 2011 建筑技术杂志社
地址:北京市广莲路1号建工大厦A座9层,邮编100055 电话:(010)68512449 (010)63928687,63928688 e-mail:jzjs@sina.com
本系统由北京玛格泰克科技发展有限公司设计开发 技术支持:support@magtech.com.cn