Abstract:
According to Shijiazhuang railway station station engineering, large construction close to existing lines in construction of foundation pit deformation monitoring is studied. Put forward the traditional monitoring and dynamic monitoring of the combination of new monitoring system, overall monitoring network and longitudinal monitoring surface arranged according to the actual situation, the forced deformation of foundation pit monitoring at the same time realize the dynamic monitoring of the existing lines, and through the overall analysis, charts, computation, parallel processing method, achieve the existing lines and the surrounding deformation control; From the results of the study, the use of traditional combined with dynamic monitoring model is effective.
XU Wei,SU Zhong-shuai,YI Qing-he et al. SHIJIAZHUANG RAILWAY STATION CLOSE TO EXISTING LINES IN CONSTRUCTION OF PIT DEFORMATION MONITORING TECHNOLOGY[J]. Architecture Technology, 2014, 45(7): 638-640.