Abstract:
With the construction process of Wangjing SOHO T3 Tower, the application of the measure technology of the complex buildings is recited, including the control axis of the top and undergrad, the change between the Relative coordinate system and Geodetic coordinate system, vertical transfer of the control points, control measure of the big node and the periphery line of the plane.