建筑技术
 
 
建筑技术
地铁与市政工程施工技术 最新目录 | 下期目录 | 过刊浏览 | 高级检索
地铁工程冻结法土体加固施工及质量监控
SOIL REINFORCEMENT BY FREEZING METHOD AND QUALITY CONTROL IN SUBWAY PROJECT
 全文: PDF (0 KB)   HTML (1 KB)  输出: BibTeX | EndNote (RIS)      背景资料
摘要 北京地铁六号线二期工程起点至物资学院站区间左线泵站,采用冻结法加固土体。施工过程中对钻孔、冷冻设备和冻结帷幕等进行验收,土体开挖前和开挖过程中进行检查,冻结法施工历时9个月,土体加固效果良好,控制了地表沉降及对周围建筑物的影响。
服务
把本文推荐给朋友
加入我的书架
加入引用管理器
E-mail Alert
RSS
作者相关文章
尉志杰
朱雨阳
叶海滨
关键词地铁泵房   冻结法施工   土体加固     
Abstract: Freezing method is adopted to reinforce the soil of left line pump room at interval between the starting station and Wuzi University Station of Beijing Subway Line 6 Phase II project. Drilling and freezing equipments and frozen curtain are accepted during construction, and inspection is carried out before and during earth excavation. The freezing construction lasts 9 months. The soil is effectively reinforced, and ground settlement and influence on surrounding buildings are controlled.
Key wordssubway pump room   freezing construction   soil reinforcement   
引用本文:   
尉志杰,朱雨阳,叶海滨. 地铁工程冻结法土体加固施工及质量监控[J]. 建筑技术, 2014, 45(9): 777-779.
WEI Zhi-jie,ZHU Yu-yang,YE Hai-bin. SOIL REINFORCEMENT BY FREEZING METHOD AND QUALITY CONTROL IN SUBWAY PROJECT[J]. Architecture Technology, 2014, 45(9): 777-779.
链接本文:  
http://www.jzjs.com/CN/     或     http://www.jzjs.com/CN/Y2014/V45/I9/777
 
没有找到本文相关图表信息
没有本文参考文献
[1] 杨雁翔,何勇,王红媛,张帅,马振阳. 紧邻地铁大面积软土地基坑中坑支护加固技术[J]. 建筑技术, 2015, 46(12): 1065-.
[2] 郎义勇,李兴峰,张建伟. 微型桩在土体加固中的应用[J]. 建筑技术, 2012, 43(3): 214-216.
?
版权所有 © 2011 建筑技术杂志社
地址:北京市广莲路1号建工大厦A座9层,邮编100055 电话:(010)68512449 (010)63928687,63928688 e-mail:jzjs@sina.com
本系统由北京玛格泰克科技发展有限公司设计开发 技术支持:support@magtech.com.cn