复杂地质条件下矿坑内百米级高陡边坡逆作施工
TOP-DOWN CONSTRUCTION OF HECTOMETER HIGH AND STEEP SIDE SLOPE IN MINING PIT UNDER COMPLEX GEOLOGICAL CONDITIONS
 全文: PDF (0 KB)   HTML (1 KB)  输出: BibTeX | EndNote (RIS)      背景资料
摘要 南京牛首山佛顶宫工程建于既有矿坑内,由于工期紧,削坡挖方高度高、体量大,且地质条件复杂,施工中结合岩土体特征,设计了合理坡率以保证边坡自稳,采用边坡逆作施工,解决了交叉施工的困难,确保了工程质量和施工安全。
服务
把本文推荐给朋友
加入我的书架
加入引用管理器
E-mail Alert
RSS
作者相关文章
孙晓阳
马明磊
陈 斌
颜卫东
张 帅
关键词矿坑内建筑   高边坡   预应力锚索   逆作施工     
Abstract: Nanjing Foding Palace on Niushou Mountain is built in an existing mining pit. Considering tight construction schedule, high slope and large excavation workload, and complex geological conditions, reasonable slope ratio is designed according to the characteristics of rock and soil stratum, to protect the stability of side slope. Top-down side slope construction is adopted to successfully solve the difficulties in cross construction and effectively guarantee engineering quality and construction safety.
Key wordsbuilding in mining pit   high side slope   prestressed anchor cable   top-down construction   
引用本文:   
孙晓阳,马明磊,陈 斌等. 复杂地质条件下矿坑内百米级高陡边坡逆作施工[J]. 建筑技术, 2014, 45(9): 836-841.
SUN Xiao-yang1,MA Ming-lei,CHEN Bin et al. TOP-DOWN CONSTRUCTION OF HECTOMETER HIGH AND STEEP SIDE SLOPE IN MINING PIT UNDER COMPLEX GEOLOGICAL CONDITIONS[J]. Architecture Technology, 2014, 45(9): 836-841.
链接本文:  
http://www.jzjs.com/CN/     或     http://www.jzjs.com/CN/Y2014/V45/I9/836
 
没有找到本文相关图表信息
没有本文参考文献
没有找到本文相关文献
?
版权所有 © 2011 建筑技术杂志社
地址:北京市广莲路1号建工大厦A座9层,邮编100055 电话:(010)68512449 (010)63928687,63928688 e-mail:jzjs@sina.com
本系统由北京玛格泰克科技发展有限公司设计开发 技术支持:support@magtech.com.cn