Abstract:
Shenyang Forum 66 project adopts unidirectional cable-stayed curtain wall structure. Large diameter and initial tension of cable have relatively high requirements for design, construction and supervision, especially supervision on application of prestressing force. Emphases of supervision quality control, related difficulties and problems are analyzed in the whole course of cable production and tensioning, to enable the construction of cable-stayed curtain wall to successfully reach the design requirements and to accumulate technical experiences for similar projects.
WANG Wei,ZHANG Shan-guo. KEY SUPERVISION TECHNIQUES FOR UNIDIRECTIONAL CABLE-STAYED CURTAIN WALL OF SHENYANG FORUM 66[J]. Architecture Technology, 2014, 45(10): 897-900.