Abstract:
The 200 m-high Wangjing SOHO-T3 building adopts terraced structure, whose number of core tube is reduced from 2 to 1, so type selection and installation of vertical transportation equipment is very important. On the aspects of type selection, installation position and transition of tower crane at different construction phases, foundation preparation, installation method, climbing and lifting of tower crane are carefully arranged and organized to provide adequate lifting times and to guarantee smooth construction.
ZHANG Lu-kai,WANG Li-jun,MENG Hua-xun et al. TYPE SELECTION AND INSTALLATION OF TOWER CRANE FOR
TERRACED SUPER-HIGH BUILDING
[J]. Architecture Technology, 2014, 45(12): 1072-.