Abstract:
Beijing Greenland Center No.3 business office building project of building a total height of 151.85 meters, in order to ensure the construction safety altitude structure, selection of electric climbing frame protection system. Electric climbing a series of reliable and effective measures were adopted in the construction of frame system, proved by practice, the process has the advantages of convenient operation, high safety factor, to ensure the construction safety of high-rise building.
HU Jing,PAN Zhao-hui,LI Yu-jian et al. PROTECTION SYSTEM OF ELECTRIC CLIMBING FRAME CONSTRUCTION TECHNOLOGY[J]. Architecture Technology, 2015, 46(2): 151-.