Abstract:
Beijing Greenland Center No.4 business office building project of building height 260m, steel structure installation and welding of large amount of a total of more than 16000?t, high quality requirements of welding. Therefore, to deepen the design project of Ministry of organization, especially the strength of steel structure of steel intensive, simulated and optimized using BIM technology, construction optimization of embedded steel column support, steel plate shear wall construction, constrained connection super thick steel plate welding construction technology, control of welding deformation and residual stress, the realization of steel structure construction excellent quality of the project, and achieved good results.
ZHANG Li-li,ZHANG YU-pin,ZHANG Liang et al. COMPREHENSIVE CONSTRUCTION TECHNIQUE FOR SUPER HIGH RISE STEEL STRUCTURE[J]. Architecture Technology, 2015, 46(4): 305-309.