Abstract:
The 260?m-high Beijing Greenland Center has complex structural shape and its outside frame is made of rigid frame column and cantilever floor deck, so climbing scaffold system was used. Considering the huge workload of steel structure welding and potential fire and safety risks at high altitude, a series of fire and dropping prevention measures were adopted, such as protection by steel fabric sheet and iron sheet, etc., and removable angle steel support was innovatively used on cantilever floor deck, to maximally reduce the safety risk in construction of super-high building.