Abstract:
During foundation construction in a high-rise building project, combined lattice column and cross steel beam were used as tower crane foundation. This method inserted steel lattice column into the concrete pile, welded the cross steel beam and installed the tower crane before earth excavation and formed the lattice tower crane foundation during earth excavation, successfully guaranteeing the construction schedule and saving construction cost.