Abstract:
The roof of Liuzhou Lining Gymnasium is a composite structure made of bidirectional BOX tube truss and H section steel truss and the truss is a wide-span BOX tube truss roof structural system. This paper compared different installation methods with consideration of construction schedule, cost, convenience, quality and safety. BOX tube truss in-segment lifting method was adopted to guarantee the construction quality, safety and schedule.
LI Neng-bin, WEI Hai-liang, WANG Jun et al. IN-SEGMENT LIFTING CONSTRUCTION TECHNIQUE FOR WIDE-SPAN BOX TUBE TRUSS OF A GYMNASIUM[J]. Architecture Technology, 2015, 46(7): 594-.