建筑技术
 
 
建筑技术
热点文章(可下载) 最新目录 | 下期目录 | 过刊浏览 | 高级检索
AAO曝气池多级叠合过水廊防渗漏施工技术
CONSTRUCTION TECHNIQUE FOR MULTI-STEP OVERLAPPED WATER CORRIDOR
ANTI-SEEPAGE OF AAO AERATION BASIN
 全文: PDF (0 KB)   HTML (1 KB)  输出: BibTeX | EndNote (RIS)      背景资料
摘要 AAO曝气池工程为污水处理厂关键性构筑物,集污水生物处理和深层过滤为一体,施工中,如何能够保证叠合过水廊及周边池壁不渗漏,不影响到整个工艺的污水处理效果,是整个工程施工的关键。施工过程中通过采取一系列的防渗漏技术措施,取得了较好的工程效果。
服务
把本文推荐给朋友
加入我的书架
加入引用管理器
E-mail Alert
RSS
作者相关文章
廖玉东
关键词污水处理   生物滤池   叠合过水廊   曝气池   防渗漏      
Abstract: AAO aeration basin is a critical structure in sewage treatment plant and it plays dual roles of biological sewage treatment and deep filtration. How to prevent the leakage of overlapped water corridor and surrounding basin wall from influencing the overall sewage treatment effect is the key point in the whole construction. A series of anti-seepage techniques and measures were adopted during construction and favorable construction effects were realized.
Key wordssewage treatment   biological filter   overlapped water corridor   aeration basin   anti-seepage   
引用本文:   
廖玉东. AAO曝气池多级叠合过水廊防渗漏施工技术[J]. 建筑技术, 2015, 46(7): 644-.
LIAO Yu-dong. CONSTRUCTION TECHNIQUE FOR MULTI-STEP OVERLAPPED WATER CORRIDOR
ANTI-SEEPAGE OF AAO AERATION BASIN[J]. Architecture Technology, 2015, 46(7): 644-.
链接本文:  
http://www.jzjs.com/CN/     或     http://www.jzjs.com/CN/Y2015/V46/I7/644
 
没有找到本文相关图表信息
没有本文参考文献
[1] 王勇. 某软基场地上污水处理厂的设计实例[J]. 建筑技术, 2015, 46(6): 549-552.
?
版权所有 © 2011 建筑技术杂志社
地址:北京市广莲路1号建工大厦A座9层,邮编100055 电话:(010)68512449 (010)63928687,63928688 e-mail:jzjs@sina.com
本系统由北京玛格泰克科技发展有限公司设计开发 技术支持:support@magtech.com.cn