Abstract:
Shenzhen Bay Technology and Ecology City is located in a sea reclamation region, where the geological and hydrological conditions are poor. Considering various disadvantages in foundation pit construction, such as difficult hole forming and secant pile construction between stone layers, etc., composite enclosure method was adopted to successfully complete the foundation pit construction.
BAI Rong,WANG Xi,TAN Qi-run et al. FOUNDATION PIT SUPPORT AND PROTECTION TECHNIQUE UNDER COMPLEX GEOLOGICAL CONDITIONS IN SEA RECLAMATION REGION[J]. Architecture Technology, 2015, 46(9): 840-842.