Abstract:
Local depth of the foundation pit of Songshanhu North Station of Dongguan-Huizhou Rail Transit reaches 20.93 m. Bored pile and rotary spray pile were used to stop water and three rows of longitudinal internal support were set. The embedding depth of pile was optimized by using Lizheng Software, to guarantee the safe and reliable foundation pit support and protection.
YONG Yi,LI Kai. OPTIMIZATION ANALYSIS AND APPLICATION OF EMBEDDING DEPTH OF SUPPORTING AND PROTECTION PILES IN STATION DEEP FOUNDATION PIT[J]. Architecture Technology, 2015, 46(9): 807-809.