Abstract:
This project is the basic database of China Life Insurance Limited by Share Ltd's Insurance file, with a total of 24 independent module room. Construction of engineering structure in November 2010 started to complete most of the renovation in October 2015. In construction, according to different parts and construction difficulties, large glass sun shading louver construction and transport of heavy equipment, cooling channel closure construction technology, integrated wiring products comprehensive support and hanger construction, auxiliary roof bearing heavy equipment, data of the engine room fire plugging, BIM Technology Application, micro module in the data center applications, intelligent capacity assets management system take the multinomial construction technical measures, to organize the construction of a reasonable and orderly quality.
ZHANG Chuan-cheng,LI Xiang-dong,XIE Jian-cheng et al. Comprehensive construction technique of decoration of China life Research Center[J]. Architecture Technology, 2016, 47(2): 102-.