Abstract:
Concrete curing in winter requires long period in North China. After design and selection of electric tracing method, BIM technique was used to establish three-dimensional model for field laying of electric tracing pipe, with real-time field temperature measurement and concrete strength record. Formwork could be removed when concrete curing at local position was finished. No frost crack appeared on the cast-in-place concrete, construction schedule was shortened and construction cost was reduced.