Abstract:
Technological Research and Development Center of Bank of Beijing is a prototype project of enterprise standardization implementation. Considering different plane layout in different construction stages, BIM technique was effectively used to realize dynamic management of standardized construction site, formulate reasonable construction plan, accurately control the construction schedule, optimize construction resources and scientifically design the site layout. Uniform management and control of construction schedule, resources and quality of the whole project reduced reworking and rehandling, shortened the construction schedule, saved construction cost and improved the construction quality.
ZOU Ai-hua,LIU Liang,WU Zi-zhong et al. BIM Technique for Dynamic Management of Standardized Construction Site[J]. Architecture Technology, 2016, 47(8): 716-.