Abstract:
Optimal supporting system shall be selected and new techniques and methods shall be taken into consideration during optimization of deep foundation pit design. Dynamic optimization design during construction shall be based on the result of field experiment, site conditions and information-based construction. A project covers a building area of about 850 000 m2 and multiple supporting systems were used. Optimization design was carried out before and during construction to successfully save the construction cost and accelerate the construction speed.