Abstract:
This paper introduced the design and construction of foundation pit waterproof curtain wall in China Life Insurance Research and Development Center Project Phase II. The patented long auger rotary-jet mixing curtain pile construction process was adopted. Based on the excavation of foundation pit, the construction quality satisfied the requirements. Compared with traditional rotary-jet pile and mixing pile, long auger rotary-jet mixing curtain pile construction process is feasible and effective and could save the construction cost. It could be promoted in similar projects.
HE Shi-ming,WANG Mian-tao,LIANG Cheng-hua et al. China Life Insurance Research and Development Center Project Phase II: A Case for Design and Construction of Foundation Pit Waterproof Curtain[J]. Architecture Technology, 2016, 47(12): 1128-.