Abstract:
This paper analyzed the technical difficulties in the internal climb luffing tower crane construction of Xiamen International Center project. Various measures were adopted to guarantee the successful completion, such as optimizing the quantity of reserved holes on load bearing beam of tower crane, using tower crane and climb formwork, fixing load bearing beam and lifting and hanging by two cranes, etc.
ZHANG Shao-biao. Study on Internal Climb Luffing Tower Crane Technique in Xiamen International Center ProjecT[J]. Architecture Technology, 2017, 48(2): 188-.