Abstract:
Phase IV of Wenzhou Power Plant Project is located in a soft soil area, multiple supporting forms were adopted during excavation, such as mixing pile, steel sheet pile and masonry retaining wall, etc., according to different depths and forms of foundation pit. Existing piles in the foundation pit were reinforced through spraying and anchorage, to successfully realize general utilization of multiple supporting forms on soft soil ground.
JIAO Ting,JIN Cheng-liang. Construction Technique for General Application of Multiple Supporting Forms in Soft Soil Area[J]. Architecture Technology, 2017, 48(3): 269-.