Abstract:
In construction of the covered-excavation Huayuanqiao Station of Beijing Subway Line 6, grouting material, method and equipment were studied according to original pile design and force bearing characteristics of Huayuan Bridge, as well as grouting characteristics of sandy cobble stratum. Double-control grouting of sleeve valve tube was adopted to guarantee the structural safety of Huayuan Bridge and normal trafficking of west third ring road.