Abstract:
There were various difficulties in diaphragm wall construction of Jingshunlu Station of Beijing Subway Line 14, such as rich groundwater, complex surrounding environment, adjacent to existing bridge and poor self-stability of side soil of diaphragm wall, etc. A series of technical measures were adopted on the aspects of equipment type selection, construction of guide wall, slurry breast wall, groove construction and underwater concrete grouting, and favorable application effect was realized.
HE Fu-jun,GUO Zhi-ming,DING Gui-song. Diaphragm Wall Construction Techniques and Measures in Beijing Subway Jingshunlu Station Project[J]. Architecture Technology, 2017, 48(6): 623-.