Abstract:
The tunnel between Songjiazhuang Station and Shiliuzhuang Station of Beijing subway line 10 Phase II passes through sewage pipeline break area and tunnel top rich-water powder sand stratum. Backward grouting method was adopted for full-section, semi-section and radial deep hole grouting and stratum around tunnel face and vault was grouted, to reduce excavation risk and guarantee acceptable settlement of road surface and building.