Abstract:
In the case of under the Metro Line 1 cross-channel in Beijing Wukesong underground parking garage project, using theoretical calculation and numerical simulation, the numerical analysis software named MIDAS GTS / NX is selected to build a dimensional model by simulation of lateral channel excavation and supporting the actual construction process. From the results of calculation and analysis, the force and deformation laws of each structure are obtained. The reasons based on theory are analyzed. Finally, by guiding and predicting the project we can take the necessary precautionary measures for the project to make the construction of safe and orderly conduct.
GUO Chao1,LU Yi2,GONG Yi1 et al. Numerical Simulation analysis of Deformation and Force of Tunnel in Complex Underground Space[J]. Architecture Technology, 2017, 48(6): 645-.