Abstract:
Considering that the measured ring prestress tensioning elongation of anchorage area of Songyuan Bridge cable-stayed tower is bigger than the theoretical elongation, this paper analyzed the factors influencing large-curvature ring prestress tensioning elongation, proposed the correction method for calculation of large-curvature ring prestress tensioning elongation and studied the control method for large-curvature ring prestress tensioning.
XIN Liang,LU Wen-ting,HUANG Wei et al. Study on Ring Prestress Tensioning Control of Anchorage Area of Songyuan Bridge Cable-Stayed Tower[J]. Architecture Technology, 2017, 48(6): 665-.