Abstract:
The underground passage at central area of Beijing Olympic Park used C35P8 concrete and the maximum thickness of both ground and ceil was 1.5m. There were dense steel bars in the construction and difficulties were successfully overcome in construction of massive watertight concrete. Specific measures were adopted for raw materials of concrete, mixing proportion, thermal insulation and curing, etc.