Abstract:
Aiming at the present stage building floor type of full house scaffold, large amount of labor workers are used, the labor intensity is high, the erection period is longer. And there are some security risks and other shortcomings. A high degree of mechanization of a new integral lifting floor scaffold is proposed for the first time in this paper. Its structural configuration is designed, and its components and specifications of timber is calculated. It is proved this new scaffold can achieve the propose of safe and reliable. Its operation is simple, and it can save time.