Abstract:
In this paper, a large underground double garage in Nanning City is taken for example, using the finite element software PKPM to implement numerically analyze of the basement garage floor structure, then the independent foundation plus sealing plate structure is finally selected to optimize the original design scheme. The analysis results show that this type of structure is convenient to construction and significantly reduce the cost.