Abstract:
In the whole production course of prefabricated shield segment for Beijing Subway Line 16 bid 01 project, various measures were adopted, such as strictly selecting raw materials, optimizing concrete mix proportion and selecting high-quality admixture and mold release agent.
WANG Yan-yan,TENG Yan,DENG Liang. Production Process Control for Appearance Quality of Subway Shield Segment[J]. Architecture Technology, 2017, 48(10): 1088-.