Abstract:
Cast in place wall is widely used in tunnel engineering, but still often faced with a variety of construction problems. Relying on the Qingdao Blue Silicon Valley tunnel in Laoshan, in-depth analysis of the geological conditions and existing engineering construction technical level and construction method of selection of suitable site conditions, construction sequence optimization of partition, and successfully applied to site construction, improve construction quality and efficiency, to provide technical support for the same type of engineering.
LU Gang,LIU Yong-kui,JIA Li-hong. Research on key technology of tunnel in construction of middle wall[J]. Architecture Technology, 2017, 48(11): 1149-.