Abstract:
During the construction process of Pre-embedding anchor bolts group in Guorui, Xi'an Financial Center, through the study of anchor bolts group and the position relationship between anchor bolt group and reinforced concrete structure, separated combined anchor bolt bracket technology combining three-dimensional coordinate observation technology of total station is made, then successfully finished the construction of pre-embedding anchor bolts group.
HAN Peng1,ZHAO Dong-sheng1,WANG Xiao-ju2. anchor bolts group Pre-embedding Technology of Steel Structure in super high-rise building[J]. Architecture Technology, 2017, 48(12): 1327-.