施工技术 |
最新目录 |
下期目录 |
过刊浏览 |
高级检索
|
|
沉管干提土式矩形咬合灌注连续桩墙施工技术及设计要点 |
陈建兰1,翁功伟21 |
.义乌工商职业技术学院,322000,浙江义乌;2.同济大学,200092 ,上海 |
|
IMMERSED TUBE DRY UP SOIL TYPE RECTANGULAR BITE PERFUSION CONTINUOUS PILE WALL CONSTRUCTION TECHNOLOGY FOR DESIGN ANALYSIS |
CHEN Jian-lan1, WENG Gong-wei2 |
1.Yiwu Industrial & Commercial College, 322000, Yiwu, Zhejiang, China; 2.Tongji University, 200092, Shanghai, China |
|
摘要 |
|
关键词: |
Abstract:
|
Key words: |
|
引用本文: |
陈建兰1,翁功伟2. 沉管干提土式矩形咬合灌注连续桩墙施工技术及设计要点[J]. 建筑技术, 2018, 49(5): 538-.
|
|
|
|
CHEN Jian-lan1,WENG Gong-wei2. IMMERSED TUBE DRY UP SOIL TYPE RECTANGULAR BITE PERFUSION CONTINUOUS PILE WALL CONSTRUCTION TECHNOLOGY FOR DESIGN ANALYSIS[J]. Architecture Technology, 2018, 49(5): 538-.
|
链接本文: |
http://www.jzjs.com/CN/ 或 http://www.jzjs.com/CN/Y2018/V49/I5/538 |
|
|
|