Research On Unloading Technology of Steel Roof Structure for Beijing New Airport Terminal
SU Ying-qiang1, WANG Liu-cheng1, DUAN Xian-jun2, MA Guo-liang1, WAN Tao-ping1, Tong Shu-jing1
1. Zhejiang Jinggong Steel Building Group Co., Ltd, 312030, Shaoxing, Zhejiang, China; 2. Beijing Urban Construction Group Co., Ltd, 100088, Beijing, China
Abstract:
The roof of the Beijing New Airport Terminal Building adopts an irregular free-form space truss structure with a maximum span of 107 m. The numerical simulation analysis of the roof structure unloading process shows that the deformation and stress monitoring results are in good agreement with the finite element analysis results. The unloading calculation model is reasonable and correct, and the whole structure is stable during the unloading process, which verifies the site construction plan and The feasibility of unloading technology.
SU Ying-qiang1,WANG Liu-cheng1,DUAN Xian-jun2 et al. Research On Unloading Technology of Steel Roof Structure for Beijing New Airport Terminal[J]. Architecture Technology, 2018, 49(9): 951-.