某会展中心张弦桁架屋盖带柱滑移施工仿真分析
万馨1,赵海旭1,苏英强2
1.内蒙古科技大学土木工程学院,014010,内蒙古包头;2.浙江精工钢构集团有限公司,312030,浙江绍兴
Simulative Analysis on Slippage Construction of Truss String Roof Structure with Column in an Exhibition Center Project
WAN Xin1, ZHAO Hai-xu1, SU Ying-qiang2
1.College of Architecture and Civil Engineering, Inner Mongolia University of Science and Technology, 014010, Baotou, Inner Mongolia, China;
2.Zhejiang Jinggong Steel Building Co., Ltd., 312030, Shaoxing, Zhejiang, China
 全文: PDF (0 KB)   HTML (1 KB)  输出: BibTeX | EndNote (RIS)      背景资料
摘要 新疆某会展中心二期工程展馆的钢屋盖采用张弦桁架结构形式,其中B区展馆的张弦桁架每榀标高各不相同。为对B区屋盖体系带柱滑移施工过程进行安全控制,采用大型通用有限元软件midas Gen对张弦桁架屋面结构进行施工仿真分析。介绍拉索张拉控制、带柱滑移不同步分析和风荷载对施工过程的影响。模拟分析的结果表明:对带柱滑移施工过程中的桁架拉索进行张拉时,张弦桁架结构符合各项控制指标;滑移不同步允许值随滑移结构桁架榀数的增加而减少,须精准控制滑移施工中的同步性;风荷载对滑移施工过程影响较小。
服务
把本文推荐给朋友
加入我的书架
加入引用管理器
E-mail Alert
RSS
作者相关文章
万馨1
赵海旭1
苏英强2
关键词张弦桁架   带柱滑移施工   施工仿真分析   张拉控制     
Abstract: The steel roof of exhibition hall in phase II of an Exhibition Center project in Xinjiang is a truss string structure, and the elevation of each truss frames of the exhibition hall in Zone B is different. To realize safety control of slippage construction of roof system with column in Zone B, the general finite element software midas Gen was used for simulative analysis on construction of truss string truss roof structure. This paper introduced the cable stretching control, non-synchronization of slippage with column and influence of wind load on construction. It was found that the truss string structure satisfies various control indices in truss string stretching during slippage with column; the allowable value of slippage non-synchronization reduced after the increase of truss frame number, so accurate synchronization control was required during slippage construction; wind load produced very little influence of the slippage construction.
Key wordstruss string   slippage with column   simulative analysis of construction   stretching control   
引用本文:   
万馨1,赵海旭1,苏英强2. 某会展中心张弦桁架屋盖带柱滑移施工仿真分析[J]. 建筑技术, 2018, 49(9): 1011-.
WAN Xin1,ZHAO Hai-xu1,SU Ying-qiang2. Simulative Analysis on Slippage Construction of Truss String Roof Structure with Column in an Exhibition Center Project[J]. Architecture Technology, 2018, 49(9): 1011-.
链接本文:  
http://www.jzjs.com/CN/     或     http://www.jzjs.com/CN/Y2018/V49/I9/1011
 
没有找到本文相关图表信息
没有本文参考文献
[1] 陈红梅, 潘水标, 陈水祥, 洪国松, 陈雅能. 巨型张弦桁架铸钢节点支撑架法安装技术[J]. 建筑技术, 2014, 45(6): 526-528.
[2] 简鸿福, 杨福林, 李传奇. 交叉张弦桁架结构预应力张拉技术[J]. 建筑技术, 2014, 45(12): 1130-1132.
?
版权所有 © 2011 建筑技术杂志社
地址:北京市广莲路1号建工大厦A座9层,邮编100055 电话:(010)68512449 (010)63928687,63928688 e-mail:jzjs@sina.com
本系统由北京玛格泰克科技发展有限公司设计开发 技术支持:support@magtech.com.cn