Abstract:
In view of the Financial Street the group encountered underground cave into King City A2 project pile construction process, to ensure the quality of the pile, the pile location of underground cave proved before the construction of the underground cave exploration through underground caves, position determination, pile foundation pile through underground caverns template design with the installation, reinforcement installation, concrete pouring of the concrete steps and precautions in detail; bored pile and the underground cave has proven before the construction of the shifting process.
QIAO Wen-chao,WENG Bang-zheng,ZHENG Xiong et al. Research on construction technology of cast-in-place pile through underground caverns[J]. Architecture Technology, 2018, 49(10): 1034-.