Abstract:
Compared with the traditional wooden formwork erection of structural column free pouring formwork construction process has convenient operation, the appearance and the completion of construction of good quality, at the same time as long as the concrete continuous supply situation, can greatly save time; then the masonry construction at the same time it can be the construction of structural column, two compared to the traditional process no discontinuity. The quality of the surface, masonry and structural column flatness error minimum, reduce the plastering construction difficulty of the operation, to avoid the quality problems caused cracking plastering construction, has good security, high efficiency and maneuverability. Therefore, the construction pillar free formwork technology will become the mainstream of the future construction direction. For different location of the constructional column, the outer shell membrane is also different, which is also a key research direction high-rise building projects, so as to sum up our experience and constantly learn and explore, so as to speed up the development of Chinese architecture.