超高层结构施工期起重设备抗震分析方法探究
李增玉1,张茅1,潘文2,赵刚2,乔稳超1
1.中国建筑第二工程局有限公司,100160,北京;2.昆明理工大学建筑工程学院,650220,昆明
Study of seismic fortification target analysis for hoisting equipment 
during super high-rise building construction 
LI Zeng-yu1, ZHANG Mao1, PAN Wen2, ZHAO Gang2, QIAO Wen-chao1
1.China Construction Second Engineering Bureau Ltd., 100160, Beijing, China; 2.School of Architecture and Structure Engineering, Kunming University of Science and Technology, 650220, Kunming, China
 全文: PDF (0 KB)   HTML (1 KB)  输出: BibTeX | EndNote (RIS)      背景资料
摘要 针对超高层结构施工周期长,遭遇地震破坏后社会影响大,而相关规范缺乏专门的抗震设计要求,尤其起重设备设计中未考虑地震荷载的情况,根据结构抗震设防的原则及地震荷载取值的概率理论基础,进行理论分析,结合施工企业发展需求,对超高层施工起重设备提出了“微小震不停,中大震不倒”的设防目标,并建议采用与建筑结构抗震一致的地震荷载取值及设计方法。
服务
把本文推荐给朋友
加入我的书架
加入引用管理器
E-mail Alert
RSS
作者相关文章
关键词超高层结构   施工期抗震   地震荷载取值     
Abstract:  For super high-rise buildings, the construction period is quite long and the influence of its seismic destruction is disastrous. But no special design codes are published for aseismic design of super high-rise buildings during construction periods. Specially, hoisting equipments are designed without consideration of seismic loads under actual crane design codes. "No construction stop under Miniature earthquake, and prevention of collapse under major earthquake" is proposed as the goal of seismic fortification, based on analyzing the rule of structure seismic fortification and the theory of load assumption. And developments of construction enterprises are considered as well. Then the load assumption and design methods are proposed following the existing rule of structural seismic design.
Key wordssuper high-rise building   seismic design under construction   seismic load assumption   
引用本文:   
. 超高层结构施工期起重设备抗震分析方法探究[J]. 建筑技术, 2018, 49(10): 1068-.
. Study of seismic fortification target analysis for hoisting equipment 
during super high-rise building construction [J]. Architecture Technology, 2018, 49(10): 1068-.
链接本文:  
http://www.jzjs.com/CN/     或     http://www.jzjs.com/CN/Y2018/V49/I10/1068
 
没有找到本文相关图表信息
没有本文参考文献
[1] 孙振泉1,刘占省2,马小军1,王竞超2,张莉莉1,张进红1. 超高层建筑施工过程监测方案设计[J]. 建筑技术, 2018, 49(7): 751-.
?
版权所有 © 2011 建筑技术杂志社
地址:北京市广莲路1号建工大厦A座9层,邮编100055 电话:(010)68512449 (010)63928687,63928688 e-mail:jzjs@sina.com
本系统由北京玛格泰克科技发展有限公司设计开发 技术支持:support@magtech.com.cn