Abstract:
Based on the situation of Kunming Xishan Wanda Plaza project, introduces the influence of plug-in jib tower crane support system by structural characteristics, the situation of tower crane standard C type beam cannot be directly installed and used, the conventional dynamic plug-in support system
"C beam + overlapped beam" for optimization and improvement. Reduce the complexity of support system, reduce the difficulty of construction, and taken a series of quality, reduced risk, and improve the efficiency of the construction method, the installation accuracy of construction efficiency, ensure the quality of construction.
:
SHI Li-guo,LI Zeng-yu,ZHANG Mao et al. Optimization and installation technology of support system for super
high-rise tower crane [J]. Architecture Technology, 2018, 49(10): 1075-.